EasyManua.ls Logo

Micromeritics TriStar II 3020 - 4 Analyzer Preparation; Manifold Evacuation

Default Icon
74 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 ANALYZER PREPARATION
MANIFOLD EVACUATION
Prior to the connection of the gas inlet lines to the analyzer, the manifolds are evacuated to prepare
them for the installation of the gas lines.
1. Open the application and go to Start >All Programs >Micromeritics > TriStar
IIConfirm.
2. Go to File >Log In.
3. Go to Unit [n] > Enable Manual Control. Ensure a checkmark displays to the left of the
menu item. If the analyzer schematic does not display, go to Unit [n] >Show Instrument
Schematic.
4. Verify that all ports have sample port plugs installed.
4 Analyzer Preparation
TriStar II 3020 Confirm Installation Instructions and Checklist
302-42870-04 (Rev A) Sep 2017
4 - 1

Other manuals for Micromeritics TriStar II 3020

Related product manuals