4 ANALYZER PREPARATION
MANIFOLD EVACUATION
Prior to the connection of the gas inlet lines to the analyzer, the manifolds are evacuated to prepare
them for the installation of the gas lines.
1. Open the application and go to Start >All Programs >Micromeritics > TriStar
IIConfirm.
2. Go to File >Log In.
3. Go to Unit [n] > Enable Manual Control. Ensure a checkmark displays to the left of the
menu item. If the analyzer schematic does not display, go to Unit [n] >Show Instrument
Schematic.
4. Verify that all ports have sample port plugs installed.
4 Analyzer Preparation
TriStar II 3020 Confirm Installation Instructions and Checklist
302-42870-04 (Rev A) — Sep 2017
4 - 1