65
Data Processor
Preparation
Turning the Power ON ( | ) and OFF (
O
)
<Turning the Power ON>
[Operating Procedure]
1
Set the POWER switch to ( | ).
• The measurement screen appears after the
start-up screen.
<Turning the Power OFF>
[Operating Procedure]
1
Set the POWER switch to ( O ).
You do not have to turn the measuring head and data processor ON/OFF in order when they
are connected.
The instruments recognize connecting status automatically.
Power switch
Power switch