MIOX RIO Series Operators Manual
P/N: 102-00076-G Page 12
Installation
Your RIO Series OSG has been factory tested and must be properly installed by technicians
trained by MIOX or its representatives. This chapter describes the procedures for unpacking and
installing the RIO OSG and auxiliary equipment, including all requirements for plumbing and
electrical tie-ins. Specifications and conditions regarding electrical power to the unit, water
quality, water line pressure requirements, and other requirements for installation of your OSG
are discussed.
SAFETY PRECAUTIONS AND WARNINGS
Ensure that the facility and the installation are in conformance with all codes and
standards. Please refer to the MIOX Hydrogen White Paper or your local authority having
jurisdiction for more information. Untrained persons should not attempt to install or
operate MIOX OSGs.
A liquid barrier system is mandatory. Ensure that all hydrogen vent lines slope
towards the oxidant tank.
Ensure that no valves, drop legs, or P-traps are in the hydrogen vent lines. Do NOT cross connect
vent lines.
Ensure that storage tanks are labeled properly.
Disconnect power before working on units. Do not reconnect the power to the switch gear enclosure
until installation is complete.
Do not defeat or tamper with electrical interlocks or lockout mechanisms.
All MIOX units require a good earth ground. A neutral is not a substitute for a proper earth
ground. Electrical wiring to all MIOX units should be performed by a certified electrician.
The circuit feeding the MIOX OSG should be separated from other power devices.
Failure to install unit properly could result in electrical shock.