EasyManua.ls Logo

Mitsubishi Electric MELSEC iQ-R-R6SFM - When Starting up the Previous Control System as the Control System

Mitsubishi Electric MELSEC iQ-R-R6SFM
1028 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
418
26 BASIC CONCEPT
26.7 Determination of Control System/Standby System
When starting up the previous control system as the control
system
In a redundant system, the system A is always specified as the control system when both systems are started up
simultaneously.
Even though both systems are temporarily powered off due to a power failure or other causes while the system B is operating
as the control system, the system A is started up as the control system when both systems are powered on again.
To start up the system B that was the previous control system as the control system again, create a program that uses
SM1636 (Previous control system identification flag).
For a system where a network module has been mounted, execute the SP.CONTSW instruction after a network module on
the other system is started up.
Program example
Executing a system switching instruction when the CPU module in the system A is set to the RUN state for the first time
switches the system B to the control system.
Turn on SM1646 (System switching by a user) in advance.

Table of Contents

Related product manuals