EasyManua.ls Logo

Mold-Masters TempMaster M2 Plus Series - Section 13 - Quad IO Options; 13.1 Quad IO Screen

Mold-Masters TempMaster M2 Plus Series
315 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Section 13 - Quad IO Options
WARNING
Ensure that you have fully read "Section 3 - Safety" before setting up or
using this feature with the controller.
13.1 Quad IO Screen
The M2 Plus controller has the capability to accept Quad IO cards. If this
option is available to the user, the parameters can be congured from the
Settings screen.
1. Choose [Quad IO]:
The Quad IO Conguration box opens:
Four inputs and four outputs are listed. The delay time and action columns
are user congurable.
NOTE
The [Accept] and [Cancel] boxes stay greyed out and unavailable until the
user changes a congurable parameter.
The user can also set a delay time for Quad IO inputs. The delay time is the
time taken to start an action [Run], [Standby], [Startup] or [Stop] when a
rigger is applied via the IO card. The delay time is set in minutes.
13-1
© 2021 Mold-Masters (2007) Limited. All Rights Reserved.
QUAD IO OPTIONS
M2+ Controller User Manual

Table of Contents