40
14
PV energy
supply priority
setting
Grid-tie with backup Mode
Grid-tie with backup I
Battery-Load-Grid:
PV power will charge battery
first, then provide power to
the load. If there is any
remaining power left, it will
feed-in to the grid.
Grid-tie with backup II
Load-Battery-Grid:
PV power will provide power
to the load first. Then, it will
charge battery. If there is
any remaining power left, it
will feed-in to the grid.
Grid-tie with backup III
Load-Grid-Battery:
PV power will provide power
to the load first. If there is
more PV power available, it
will feed-in to the grid. If
feed-in power reaches max.
feed-in power setting, the
remaining power will charge
battery.
Grid-tie with backup IV
If selected, it is only allowed
to set up peak time and off-
peak for electricity demand.
Programs of 15, 17, 18, 19
and 20 can’t be set and only
programs of 21, 22, 23 and
24 can be set.
Off-Grid Mode
Off-Grid I
Load-Battery:
PV power will provide power
to the load first and then
charge battery. Feed-in to
the grid is not allowed under
this mode. At the same time,
the grid relay is
Off-Grid II
Battery-Load:
PV power will charge battery
first. After battery is fully
charged, if there is
remaining PV power left, it
will provide power to the
load. Feed-in to the grid is
not allowed under this mode.
At the same time, the grid
relay is connected.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the MPP Solar MPI 12KW WP and is the answer not in the manual?

MPP Solar MPI 12KW WP Specifications

General IconGeneral
BrandMPP Solar
ModelMPI 12KW WP
CategoryInverter
LanguageEnglish

Related product manuals