A-1
Chemgard Infrared Gas Monitor Appendix A, Check List
Appendix A
Check List
Before applying power to the Chemgard Infrared Gas Monitor, check for all items in the following table:
ITEM
CHECK FOR:
CHECKED OR INITIALED
1
Proper mounting of Chemgard Infrared Gas Monitor on a non-vibrating
surface which does not block the front panel. Mounting must be away from
direct solar heating.
2
Correct electrical connections and wiring to Chemgard Infrared Gas Monitor.
Wiring must be done for proper voltage.
3
Proper tubing for sample line.
4
Removal of all caps and plugs at sample line inlets and exhaust.
5
Proper end-of-line filters installed.
6
Disabling of unused sampling points.
7
Possession of proper calibration kit and check gases for calibration.
8
An established routine calibration schedule.