EasyManua.ls Logo

multivac C 500 - Inert gas connection

multivac C 500
43 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Transport, Set-up, Putting into operation
Betriebsanleitung 07.06.2005 15/43
ba_c500_50s2GB06.fm ega
Inert gas connection Note the safety instructions.
Caution!
The gas input pressure must not exceed 3 bar.
Connect a gas hose with an internal diameter of 8 mm (max. length:
5 m) from the pressure reducer (B) of the gas tank to the nipple.
Open the stop valve of the gas tank (C).
The pressure reducer (B) on the gas bottle should be set to: 3 bar.
Open the shut-off valve (C) on the gas bottle.
Pull pouch opening over the gas flushing jet so that the inert gas flows
directly into the pouch. See chapter "Packaging" for more information.
C
B
0,7 - 2,5 bar
Di 8 mm
mm
3 bar
max. 5 m

Related product manuals