I/O Board Installation 5-7
1. Check that the front stabilizer is in the pulled-out position. If not, remove the
screw securing the stabilizer and pull it out (see Figure 5-3).
A Front Stabilizer
Figure 5-3. Stabilizer and PCIX Unit Front Bezel
2. Remove the front bezel from the front of the PCIX unit by pulling it first
from the bottom and then away from the top of the unit.
3. Remove the two screws (one on each side) securing the PCIX unit to the
front of the cabinet (see Figure 5-4).
A Server Screws (2)
Figure 5-4. PCIX Unit Screws
A
A