EasyManua.ls Logo

NEC Express5800 320Fd-MR - Off-Line Maintenance Utility; Starting the Off-Line Maintenance Utility

NEC Express5800 320Fd-MR
254 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance 6-9
OFF-LINE MAINTENANCE UTILITY
The Off-line Maintenance Utility is an OS-independent maintenance program. When you are unable
to start the OS-dependent NEC ESMPRO to troubleshoot a problem, the Off-line Maintenance
Utility can be used.
Starting the Off-line Maintenance Utility
The Off-line Maintenance Utility may be started in the following ways.
1. Boot peripheral devices at first, then power on the Express server.
2. Load the [EXPRESSBUILDER] DVD into the optical disc drive of the Express server.
3. After loading the DVD, reset (by pressing <Ctl> + <Alt> + <Delete> keys) or power off and
on to reboot the Express server.
Following menu appears on the DVD.
IMPORTANT:
Default selection is [Os installation] on the menu. When there is no operation for ten seconds
after the Boot selection menu appears, [Os installation] starts automatically.
Tool menu:
Select this to launch the
Off-line Maintenance Utility.

Table of Contents

Related product manuals