EasyManua.ls Logo

NEC Express5800 320Fd-MR - Page 236

NEC Express5800 320Fd-MR
254 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8-18 System Upgrade
6. Release the levers attached on both
sides of the socket of the DIMM to
be removed. It will be unlocked and
the DIMM can be removed.
7. Attach the memory duct.
8. Attach the top cover of the CPU/IO module and secure it with screws.
9. Refer to page 8-100 and install the CPU/IO module.
10. Connect the power cords.
11. Press the POWER switch to power on the server.
12. Verify that POST displays no error message.
If POST displays an error message, write it down and see the POST error message list on page
7-4.

Table of Contents

Related product manuals