EasyManua.ls Logo

NEC POWERMATE ES 5250 - Closing the Chassis Floor

NEC POWERMATE ES 5250
276 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-20 Installing Options
6. Grasp the two board handles and pull the board out
further if you cannot access to the components you are
upgrading. If you need to replace the board, see
Removing the System Board Minitower later in this
chapter.
Opening the chassis floor minitower
A
Screw
C
Chassis Feet
B
Top Edge of Floor
D
Chassis Floor
Closing the Chassis Floor
To close the chassis floor, proceed as follows.
1. If the system board was partially slid out for access to
board components, slide it back into the chassis using the
two board handles.
If the system board was removed, see Replacing the
System Board Minitower for replacement procedures.
2. Pivot the floor up against the chassis and press the floor
against the chassis until the floor latches in place. Closing
the floor also plugs the system board into the riser board.

Table of Contents

Related product manuals