3-6 BA 3001 En – Edition 2.0 * * 345001b320.fm
Operation
3.5 Putting into operation
Safety instructions
• Use footholds and handles 38 to access and leave the machine
• Never use control elements as handles
• Never get on or off a moving machine! Never jump off the machine
Putting the machine into operation for the first time
Important information
• The machine may be put into operation by authorised staff only
– see chapter Selection and qualification of staff, basic responsibilities on page 2-4
and – see chapter 2 Safety instructions on page 2-1 of this Operator's Manual.
• The staff must have read and understood this Operator's Manual before putting the
machine into operation.
• The machine may only be used in technically perfect condition in accordance with its
designated use and the instructions set forth in the Operator's Manual, and only by
safety-conscious persons who are fully aware of the risks involved in operating the
machine.
• Go through the “Start-up” checklist in the following chapter.
Running-in period
Handle the machine carefully during its first 50 operating hours.
The future performance and service life of the machine are heavily dependent on the
observance of the following recommendations during the running-in period.
• Do not overload the machine, but at the same time do not drive too cautiously either, as
the machine will never reach its proper operating temperature
• Do not run the engine at high revs for extended periods
• Increase the load gradually whilst varying the engine revs
• Strictly observe the maintenance schedules in the appendix
– see chapter 5.13 Maintenance plan (overview) on page 5-31