EasyManua.ls Logo

Neware BTS9 - Chapter 8 Build Test Tutorial

Default Icon
94 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BTS User Manual
75 / 94
Neware Technology Ltd.
http://www.newarebattery.com
Chapter 8 Build Test Tutorial
Introduction of step editor interface
Figure 8-1 Step file storage path
1 Test file storage (set the root directory and the project folder)
2 File operation (Add, save, save as, delete)
3 List of step files under the current project (selected as currently displayed step files)
4 Main step zone (This includes test flow, variable management, editing DBC, display settings, record settings, and
NG Settings)
5 Protection condition (each step is a separate protection parameter)
6 Record condition (each step is a separate recording parameter)
7 Test information (relevant description of the tests)
The following describes the saving path of step files and the relationship between function interfaces and step files.
Figure 8-2 Step File storage path