GEO S12 HARDWARE SETUP PROCEDURE Page 45/106
(7) Flip the cluster upside down to access connector plates located on the down side;
(8) Repeat all above steps from #2 to #6;
(9) Position the two “U” brackets from VNI-ABRK kits on the outer cabinets next the angle
plates, and tight them to the cabinets using the shoulder screws provided with these kits
(using Loctite 243 or equivalent);
(10) Four screws 12mm diameter (not provided) are required to secure the “U” brackets
under the ceiling;