EasyManua.ls Logo

Nexo LS18

Default Icon
106 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 72/106 GEO S12 HARDWARE SETUP PROCEDURE
8.5 Testing and Maintenance of the system
General: Geo is a precision piece of equipment and requires regular attention to
maintenance in order to give long and reliable service. NEXO recommends regular testing
of loudspeaker rigging components, preferably using a suitable test rig coupled with a
visual inspection.
Fasteners: there are several critical points in the LS18 and GEO S12 cabinets.
Of primary concern are:
a) The grid screws attaching the grid to the cabinet
b) The machine screws attaching the connecting plates to the cabinet.
c) The screws attaching the directivity flanges to the front of the cabinet.
These fasteners should be regularly checked and tightened as necessary.
Cleaning: The exterior of the cabinet and the rigging system can be cleaned with a damp
cloth soaked in mild soapy water. On no account use solvent based cleaners, which may
damage the finish of the cabinet
After cleaning, the rigging system must be treated with a suitable lubricant to prevent
rusting. NEXO recommends the use of Scottoil FS365 which is a water-based lubricant
with a mixture of machine oil, surfactant and anti-rust treatment.

Table of Contents

Related product manuals