About this document
DN991456 © Nokia Corporation 11 (72)
Issue 3 en Nokia Proprietary and Confidential
Caution
1 About this document
This document describes the installation of the Nokia MetroSite
TM
EDGE Base
Station from delivery of the BTS package to the site to BTS commissioning. Read
carefully Nokia MetroSite EDGE Base Station: Warnings and Cautions and
Nokia MetroSite EDGE Base Station: Requirements for Installation and
Operation before starting the installation.
The following information can be found in this document:
• Working order for installation
• Preparations before installation
• Tools and parts required
• How to safely unpack the delivery
• Contents of the BTS delivery
• How to remove and reinstall units
• How to install the BTS on a wall or a pole
• How to cable the BTS
• Completing the installation after commissioning
Installation, commissioning and maintenance of the Nokia MetroSite EDGE Base
Station (BTS) may be performed only by trained and authorised personnel.