EasyManua.ls Logo

Nokia ONT - Page 85

Nokia ONT
202 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Install
a
G
-
24
26G
-
B
indoor
ONT
Connect a UPS to a G-2426G-B ONT
Nokia
ONT
3FE-49441-ABAA-TCZZA
June
2021
Issue 1
85
6
Verify the “System Status” LED is “ON” with green illumination.
Ensure that the System Status” LED is only the one in green illumination. If any other LED is
illuminated recheck the battery pack is seated and ensure that all wiring from UPS to
G-2426G-B ONT is installed correctly as listed by ONT specific instructions.
E
ND OF
STEPS

Table of Contents

Related product manuals