12 Contents
NN10600-175 6.1S2
Installing covers for a Multiservice Switch 7440 326
Installing CP cables for BITS 329
Installing dc power cables onto a multiport aggregate device 332
Installing dc power cables onto a Multiservice Switch 7420 335
Installing dc power cables onto a Multiservice Switch 7440 337
Installing dc power cables onto a Multiservice Switch 7460 339
Installing dc power cables onto a Multiservice Switch 7480 343
Installing ferrite beads onto dc power cables 346
Installing FP cables 349
Installing multiple MSA32 sparing panels (DB15 or BNC) 356
Installing multiple MSA32 sparing panels (RJ-45) 360
Installing seismic brackets for a Multiservice Switch 7460 366
Installing seismic hardware 370
Labeling a card cable connection 372
Making a BITS wire 375
Making a braided shield 379
Making customer equipment cables 382
Moving a door hinge to the other side of a cabinet 383
Packing a processor card 386
Placing and anchoring a Multiservice Switch cabinet 388
Powering down a Multiservice Switch 391
Powering up a Multiservice Switch 7420 392
Powering up a Multiservice Switch 7440 394
Powering up a Multiservice Switch 7460 397
Powering up a Multiservice Switch 7480 399
Preparing the floor for a Multiservice Switch cabinet 401
Preparing the floor for a seismic cabinet 404
Removing a 13-inch termination panel from a Multiservice
Switch 7420 406
Removing a 13-inch termination panel from a Multiservice
Switch 7440 408
Removing a 19-inch rack-mounted termination panel 410
Removing a blank processor card 411
Removing a cabinet door 412
Removing a cabinet door alarm cable 413