45
Multiservice Switch 7400 Hardware Installation, Maintenance, and Upgrade 6.1S2
Chapter 3
Multiservice Switch 7440 installation
Install a Nortel Networks Multiservice Switch 7440 on the floor or in a rack
or cabinet.
• “Prerequisites to Multiservice Switch 7440 installation” (page 45)
• “Multiservice Switch 7440 installation task flow” (page 46)
• “Multiservice Switch 7440 installation supporting information”
(page 49)
Prerequisites to Multiservice Switch 7440 installation
• See “Unpacking a processor card” (page 539) for FP and CP handling
instructions.
• Ensure that you have completed all site preparations. For more
information, see
“Multiservice Switch 7440 installation supporting
information” (page 49).
• If you are installing the device in a rack or cabinet, ensure that it has been
properly installed and grounded. For more information, see
“Cabinet
installation” (page 105).
CAUTION
Risk of electrostatic damage
When handling processor cards, wear a grounded
antistatic wrist strap so that you do not damage electronic
parts. For more information, see
“Avoiding damage from
static electricity” (page 208).