EasyManua.ls Logo

Nortel 7400 - Installing a Vertical-Mount Multiservice Switch 7420 or Multiservice Switch 7440

Nortel 7400
550 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
308 Chapter 39 Hardware procedures
NN10600-175 6.1S2
Installing a vertical-mount Multiservice Switch 7420 or
Multiservice Switch
7440
Install a vertical-mount device under or beside a desk or table.
Prerequisites
• You need a vertical mount kit with PEC NTHQ08.
• Ensure that your floor plan takes into consideration all of the information
in
“Site preparation for free-standing Multiservice Switch equipment”
(page 49).
• Ground yourself to an appropriate anti-static discharge apparatus while
handling the shelf assembly (device).
Procedure steps
1 Set the chassis on a clear work surface.
2 Attach the cable guide to the fan-less side of the chassis using the
hardware provided.
3 Attach the shelf assembly to the fan side of the chassis, and then attach
the plate to the shelf assembly. See the figure
“Attaching the plate to the
shelf assembly” on page 309.

Table of Contents