35
Multiservice Switch 7400 Hardware Installation, Maintenance, and Upgrade 6.1S2
Chapter 1
Multiservice Switch 7420 installation
Install a Nortel Networks Multiservice Switch 7420 in or beside a desk-top
(desk-top or vertical-mount), or in a standard 19-inch rack or cabinet.
• “Prerequisites to Multiservice Switch 7420 installation” (page 35)
• “Multiservice Switch 7420 installation task flow” (page 36)
• “Multiservice Switch 7420 installation supporting information”
(page 38)
Prerequisites to Multiservice Switch 7420 installation
• See “Unpacking a processor card” (page 539) for FP and CP handling
instructions.
• Ensure that you have completed all site preparations. For more
information, see
“Multiservice Switch 7420 installation supporting
information” (page 38).
• If you are installing Multiservice Switch equipment in a rack or cabinet,
ensure that it has been properly installed and grounded. For more
information, see
“Cabinet installation” (page 105).
CAUTION
Risk of electrostatic damage
When handling processor cards, wear a grounded
antistatic wrist strap so that you do not damage electronic
parts. For more information, see
“Avoiding damage from
static electricity” (page 208).