EasyManua.ls Logo

Nortel 7400 - Contents

Nortel 7400
550 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Contents 13
Multiservice Switch 7400 Hardware Installation, Maintenance, and Upgrade 6.1S2
Removing a control processor 416
Removing a CP Ethernet cable 420
Removing a multiport aggregate device 421
Removing a Multiservice Switch 7420 422
Removing a Multiservice Switch 7440 427
Removing a Multiservice Switch 7480 430
Removing a Multiservice Switch cabinet from a pallet 432
Removing a rack-mounted alarm panel / power and alarm panel 437
Removing a shelf interconnect cable 439
Removing an FP 441
Removing CP cables for BITS 444
Removing FP cables 445
Removing power cables 447
Removing the cable management bracket from a Multiservice
Switch 7460 453
Removing the cooling unit from a Multiservice Switch 7440 455
Removing the cooling unit from a Multiservice Switch 7460 458
Removing the cooling unit from a Multiservice Switch 7480 461
Removing the front cover from a Multiservice Switch 7440 464
Removing the power supply from a Multiservice Switch 7440 466
Removing the power supply from a Multiservice Switch 7460 471
Removing the power supply from a Multiservice Switch 7480 474
Removing the rear cover from a Multiservice Switch 7440 478
Removing the shelf assembly of a Multiservice Switch 7460 480
Replacing the air filter in a Multiservice Switch 7440 484
Replacing the air filter in a Multiservice Switch 7460 489
Replacing the air filter in a Multiservice Switch 7480 493
Replacing the cooling unit power cord on a Multiservice Switch 7480
500
Replacing the external alarm cable 502
Resetting the alarm hardware 506
Routing cables out of a cabinet 508
Routing card cables on a Multiservice Switch 7420 510
Routing card cables on a Multiservice Switch 7440 512
Routing card cables on a Multiservice Switch 7460 514

Table of Contents

Related product manuals