EasyManua.ls Logo

Nortel 7400 - Installing a Multiservice Switch Cabinet Door

Nortel 7400
550 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 39 Hardware procedures 291
Multiservice Switch 7400 Hardware Installation, Maintenance, and Upgrade 6.1S2
Installing a Multiservice Switch cabinet door
Install Nortel Networks Multiservice Switch cabinet door so that you can
restrict access to devices by locking the door.
Prerequisites
• You need a cabinet door kit with PEC NTJS56.
• Ensure that you have two people available to lift the door.
•Follow “Avoiding damage from static electricity” (page 208) to protect
the unit from damage by ESD or from transferring ESD to other
hardware.
Procedure steps
1 Clear the area in front of the cabinet to access it while holding the door.
2 Lift the door by the grips and guide the bottom pin into the lower hinge.
Then, slide the top into place.

Table of Contents