38 Chapter 1 Multiservice Switch 7420 installation
NN10600-175 6.1S2
“Installing a Multiservice Switch 7420 into a rack or cabinet” (page 272)
“Installing a Multiservice Switch 7420 into a seismic rack or cabinet”
(page 275)
“Installing a 13-inch termination panel on a Multiservice Switch 7420”
(page 235)
“Installing a control processor” (page 254)
“Installing a desk-top mounted Multiservice Switch 7420” (page 264)
“Installing an FP” (page 321)
“Installing a vertical-mount Multiservice Switch 7420 or Multiservice
Switch 7440” (page 308)
“Installing dc power cables onto a Multiservice Switch 7420” (page 335)
“Installing ferrite beads onto dc power cables” (page 346)
“Installing FP cables” (page 349)
“Powering up a Multiservice Switch 7420” (page 392)
“Unpacking a Multiservice Switch 7420” (page 527)
Multiservice Switch 7420 installation supporting
information
See the following sections:
“Site preparation” (page 77)
“Site preparation for free-standing Multiservice Switch equipment”
(page 49)