EasyManua.ls Logo

Nortel 7400 - Page 49

Nortel 7400
550 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 3 Multiservice Switch 7440 installation 49
Multiservice Switch 7400 Hardware Installation, Maintenance, and Upgrade 6.1S2
Multiservice Switch 7440 installation supporting
information
See the following sections:
“Site preparation” (page 77)
“Site preparation for free-standing Multiservice Switch equipment”
(page 49)
Site preparation for free-standing Multiservice Switch
equipment
Plan to run cables from the node to the nearest floor opening in a raised floor.
To accommodate the cables if you have a raised floor, you can cut an opening
into the floor at any point near the node. Do not cut under the footprint of the
unit. A 20.32
cm
2
(8 sq. in.) opening can accommodate the cables for a Nortel
Networks Multiservice Switch
7420 or Multiservice Switch 7440.
Ensure that you will be installing the node on a sturdy, flat surface.

Table of Contents

Related product manuals