42 Chapter 2 Multiservice Switch 7420 replacement
NN10600-175 6.1S2
Task flow navigation
The following references are listed alphabetically:
• “Card testing”. See NN10600-520 Nortel Networks Multiservice Switch
7400/15000/20000 Fault and Performance Management:
Troubleshooting.
• “Grounding a dc-powered Multiservice Switch 7420” (page 225)
• “Installing a 13-inch termination panel on a Multiservice Switch 7420”
(page 235)
• “Installing a 19-inch rack-mounted termination panel” (page 240)
• “Installing a control processor” (page 254)
• “Installing a desk-top mounted Multiservice Switch 7420” (page 264)
• “Installing a Multiservice Switch 7420 into a rack or cabinet” (page 272)
• “Installing a Multiservice Switch 7420 into a seismic rack or cabinet”
(page 275)
• “Installing a vertical-mount Multiservice Switch 7420 or Multiservice
Switch 7440” (page 308)
• “Installing an FP” (page 321)
• “Installing dc power cables onto a Multiservice Switch 7420” (page 335)
• “Installing ferrite beads onto dc power cables” (page 346)
• “Installing FP cables” (page 349)
• “Powering up a Multiservice Switch 7420” (page 392)
• “Removing a Multiservice Switch 7420” (page 422)
• “Removing a control processor” (page 416)
• “Removing an FP” (page 441)
• “Removing power cables” (page 447)
• “Testing a bus”. See NN10600-520 Nortel Networks Multiservice Switch
7400/15000/20000 Fault and Performance Management:
Troubleshooting.