EasyManua.ls Logo

Nortel 7400 - Page 481

Nortel 7400
550 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 39 Hardware procedures 481
Multiservice Switch 7400 Hardware Installation, Maintenance, and Upgrade 6.1S2
• You need a helper to assist with removing the shelf assembly.
• The device must be powered down. See “Powering down a Multiservice
Switch” (page 391).
• Remove a device only after you have removed the power supplies,
processor cards, and cooling unit as shown by the figure
“Exploded view
of power supplies in a Multiservice Switch 7460” (page 473).
Procedure steps
1 If the shelf used an external alarm, disconnect the external alarm cable as
shown in the figure “External alarm connector on a Multiservice
Switch 7460” (page 504).
2 Unfasten the 10-mm (3/8-in.) nut on the shelf grounding cable stud at the
rear of the shelf assembly as shown in the figure “Grounding a
Multiservice Switch 7460 to the site ground window” (page 230).
3 Tape the grounding cable to the mounting apparatus so that it does not
get snagged by the shelf assembly when it is removed.
4 While one person holds the shelf assembly, have the other person
unfasten the eight 5/16-in. screws from the 2 mounting ears of the
assembly. Refer to the figure
“Shelf assembly of a Multiservice
Switch 7460 removed from a rack” (page 483).
5 Pack all shelf components in their original packaging.

Table of Contents