Chapter 39 Hardware procedures 543
Multiservice Switch 7400 Hardware Installation, Maintenance, and Upgrade 6.1S2
Procedure job aid
Table 20
Equipment checklist for unpacking a cabinet
÷ Equipment
Cabinet with pre-installed:
• doors (2) and keys (2)
• device shelving (1 or 2)
• FPs (1 to 15 for each device)
• blank processor cards (NTBP23), 14 for each device less
the number of processor cards
• cooling units and cables
• cable management unit(s)
• door alarm cables
Power supplies (up to 3 for each device) and power supply
fillers if device contains fewer than three power supplies
CPs (1 or 2 for each device)
Blank control processor card (NTBP23) if the device contains
only 1 control processor)
FP cables, as required
Termination panels, as required for FPs
Grounding cable for termination panels
Grounding strips for termination panels (1 for each panel)
Power cords (1 for each power supply)
Power cord selector guide
Antistatic wrist strap
Optional: anchoring kit
Optional: eyebolts (4)