Chapter 4 Multiservice Switch 7440 replacement 55
Multiservice Switch 7400 Hardware Installation, Maintenance, and Upgrade 6.1S2
Task flow navigation
The following references are listed alphabetically:
• “Card testing”. See NN10600-520 Nortel Networks Multiservice Switch
7400/15000/20000 Fault and Performance Management:
Troubleshooting.
• “Grounding a dc-powered Multiservice Switch 7440” (page 227)
• “Installing a Multiservice Switch 7440 into a rack or cabinet” (page 279)
• “Installing a power supply into a Multiservice Switch 7440” (page 293)
• “Installing a 13-inch termination panel on a Multiservice Switch 7440”
(page 238)
• “Installing a 19-inch rack-mounted termination panel” (page 240)
• “Installing a control processor” (page 254)
• “Installing a floor-mounted Multiservice Switch 7440” (page 267)
• “Installing an FP” (page 321)
• “Installing an ac power cable” (page 311)
• “Installing dc power cables onto a Multiservice Switch 7440” (page 337)
• “Installing ferrite beads onto dc power cables” (page 346)
• “Installing FP cables” (page 349)
• “Powering up a Multiservice Switch 7440” (page 394)
• “Removing the power supply from a Multiservice Switch 7440”
(page 466)
• “Removing a Multiservice Switch 7440” (page 427)
• “Removing a 13-inch termination panel from a Multiservice
Switch 7440” (page 408)
• “Removing a 19-inch rack-mounted termination panel” (page 410)
• “Removing a control processor” (page 416)
• “Removing an FP” (page 441)
• “Removing power cables” (page 447)