76 Chapter 7 Multiservice Switch 7480 installation
NN10600-175 6.1S2
Figure 17
Multiservice Switch 7480 installation task flow: part 2
Task flow navigation
The following references are listed alphabetically:
• “FP addition” (page 151)
• “Grounding a Multiservice Switch 7480” (page 231)
• “Installing a cooling unit into a Multiservice Switch 7480” (page 260)
• “Installing a power supply into a Multiservice Switch 7480” (page 301)
• “Installing a Multiservice Switch 7480” (page 286)
• “Installing a control processor” (page 254)
• “Installing a shelf interconnect cable” (page 307)
• “Installing an ac power cable” (page 311)
• “Installing dc power cables onto a Multiservice Switch 7480” (page 343)
• “Installing ferrite beads onto dc power cables” (page 346)
• “Installing FP cables” (page 349)
• “Powering up a Multiservice Switch 7480” (page 399)
• “Unpacking a Multiservice Switch 7480” (page 536)
Yes
No
Add another
FP?
Powering up a
Multiservice
Switch 7480
A
End
FP
addition
PP_TASK_1012