Chapter 8 Multiservice Switch 7480 replacement 87
Multiservice Switch 7400 Hardware Installation, Maintenance, and Upgrade 6.1S2
Task flow navigation
The following references are listed alphabetically:
• “Card testing”. See NN10600-520 Nortel Networks Multiservice Switch
7400/15000/20000 Fault and Performance Management:
Troubleshooting.
• “Grounding a Multiservice Switch 7480” (page 231)
• “Installing a Multiservice Switch 7480” (page 286)
• “Installing a cooling unit into a Multiservice Switch 7480” (page 260)
• “Installing a power supply into a Multiservice Switch 7480” (page 301)
• “Installing a control processor” (page 254)
• “Installing an FP” (page 321)
• “Installing a shelf interconnect cable” (page 307)
• “Installing an ac power cable” (page 311)
• “Installing dc power cables onto a Multiservice Switch 7480” (page 343)
• “Installing ferrite beads onto dc power cables” (page 346)
• “Installing FP cables” (page 349)
• “Powering down a Multiservice Switch” (page 391)
• “Powering up a Multiservice Switch 7480” (page 399)
• “Removing the cooling unit from a Multiservice Switch 7480”
(page 461)
• “Removing the power supply from a Multiservice Switch 7480”
(page 474)
• “Removing a Multiservice Switch 7480” (page 430)
• “Removing a control processor” (page 416)
• “Removing an FP” (page 441)
• “Removing a shelf interconnect cable” (page 439)
• “Removing power cables” (page 447)