EasyManua.ls Logo

Okolab LEO - Page 28

Okolab LEO
101 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
24
4. Put the cap on LEO gas inlet port with icon (see Figure 28) and press on Continue (see Figure 29
a). Wait stabilization time (see Figure 29 b), during this time the pump is not running. Wait until the
Leakage evaluation step is completed (see Figure 29 c).
3
Figure 28. Put the cap on LEO gas inlet port.
a
b
c
Figure 29. How to set Pump Leak Test stabilization and Leakage evaluation steps (a b c).
If the Leak test is passed, the pump works properly. The green label showing OK appears as in Figure 30.

Other manuals for Okolab LEO