Equipotential
bonding
connector
PRIM
IN: Measurement input for
primary side of the CT.
OUT: Generator output for
primary winding
resistance measurement.
A green LED lights up when the
output is active.
LEDs
I/0 Green power LED. Indicates
that the CT SB2 is switched on
and ready for operation.
Status LED.
Mains connection unit
Mains socket with fuse and ON/OFF switch
BURDEN
IN: Measurement input for
burden measurement.
OUT: Generator output for
burden measurement.
A green LED lights up when the
output is active.
See also
Figure 2-2
TAPS
Terminals for connection of CT taps
X1 to X6.
Connect each CT tap to both sockets!
A green LED lights up to indicate
which input/output is currently active.
PC and CTA
interfaces
CT ANALYZER
Input and output terminals for
connection to the CT Analyzer
measurement inputs and
generator output.