3.6 Additional Wiring for Primary Winding Resistance
Measurement
Primary winding resistance measurement may be performed separately or in
conjunction with CT testing and/or burden measurement.
The following wiring is required for primary winding resistance measurement (in
addition to the basic measurement setup shown in Figure 3-2 and Figure 3-3
and/or the additional wiring for burden measurement shown in Figure 3-4, as
required).
Figure 3-5 Additional wiring required for primary winding resistance
measurement
X1
X2
X3
X4
X5
X6
*
*
Burden
CT
Basic CT wiring,
see Figure 3-2 or Figure 3-3
Wiring for burden measurement,
see Figure 3-4
* For information how to connect the communication link between the CT SB2 and the
CT Analyzer, please refer to section 3.2 on page 20.