EasyManua.ls Logo

Panasonic PT-DZ12000U

Panasonic PT-DZ12000U
239 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12.6. Removal of G-P.C.Board
(1) Remove the upper case according to the section 12.2. "Removal
of Upper Case".
(2) Unscrew the 2 screws and remove the blindfold board.
(3) Unscrew the 6 screws and remove the connection terminals
panel with S-P.C.Board and SL-P.C.Board.
(4) Unscrew the 4 screws and remove the signal processing block.
(5) Unscrew the 3 screws and remove the NN-Module.
32
PT-DZ12000U / PT-DZ12000E / PT-D12000U / PT-D12000E / PT-DW100U / PT-DW100E

Table of Contents

Other manuals for Panasonic PT-DZ12000U

Related product manuals