Installer manual Fleck 5600 SXT - Maintenance
86 / 104 Ref. MKT-IM-013 / E - 23.09.2020
9.4.9 Valve on tank assembly
1. Lubricate the seals with approved silicone grease.
2. Spin the valve(1) onto the tank(2), ensuring the threads are not cross-threaded.
3. Rotate the valve(1) clockwise and freely, without using force until it comes to a stop.
Info
This stop position is considered point zero.
4. Rotate the valve(1) clockwise from point zero to between ¼turn and ½turn.
Caution - material
Risk of damage due to excessive force!
Do NOT exceed 27Nm of torque when installing the valve. Exceeding this limit may
damage the threads and cause failure.
Point 0 ½ turn
Point 0
¼ turn