EasyManua.ls Logo

Peterbilt 579 - Page 250

Peterbilt 579
414 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PREVENTIVE MAINTENANCE SCHEDULE
5
PREVENTIVE MAINTENANCE (PM) INTERVALS
SYSTEM COMPONENT MAINTENANCE TASK
Recommended PM
Interval
I A B
C
D E
Front Axle
(Meritor)
Total Vehicle Alignment
Check and adjust as required.
X X
Steering knuckle
spindles,
thrust bearings, kingpins,
drawkeys, tie rod ends,
steering stops, and
bushings
Inspect for
wear and damage and endplay. Shim or replace as
required (shown on page 5-130).
X
Kingpin bushings,
thrust
bearings, and tie rod ball
ends
Lubricate with
approved grease. X
Drawkeys Tighten
nuts X X
5-14 Y53-6047–2C (04/13)

Table of Contents

Related product manuals