EasyManua.ls Logo

Peterbilt 579 - Page 251

Peterbilt 579
414 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PREVENTIVE MAINTENANCE SCHEDULE
PREVENTIVE MAINTENANCE (PM) INTERVALS
SYSTEM COMPONENT MAINTENANCE TASK
Recommended PM
Interval
I A B
C
D E
Front Axle
(Dana)
Total Vehicle Alignment
Check and adjust as required.
X X
Kingpin bushings,
thrust
bearings, and tie rod ball
ends (ON HIGHWAY)
Lubricate with approved grease. X
Kingpin bushings,
thrust
bearings, and tie rod ball
ends (OFF-HIGHWAY)
Lubricate with
approved grease. X
Steering knuckle
spindles,
thrust bearings, kingpins,
drawkeys, tie rod ends,
steering stops, and
bushings (ON HIGHWAY)
Inspect for
wear and damage and for endplay. Shim or replace
as required.
X
Steering knuckle
spindles,
thrust bearings, kingpins,
drawkeys, tie rod ends,
steering stops, and
bushings (OFF-HIGHWAY)
Inspect for
wear and damage and for endplay. Shim or replace
as required.
X
5
(04/13) Y53-6047–2C 5-15

Table of Contents

Related product manuals