EasyManua.ls Logo

Peterbilt 579 - Page 268

Peterbilt 579
414 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PREVENTIVE MAINTENANCE SCHEDULE
5
PREVENTIVE MAINTENANCE (PM) INTERVALS
SYSTEM COMPONENT MAINTENANCE TASK
Recommended PM
Interval
I A B
C
D E
Heating
and
Air
Conditioning
Air conditioner
Operate the system.
X
Heater and
air conditioner
Perform the checks listed shown on page 5-111.
X
Full operational
and diagnostic check. X
Cabin fresh
air lter (ON
HIGHWAY)
Inspect and clean, replace if necessary, as shown on page
5-112.
X
Cabin fresh
air lter
(OFF-HIGHWAY)
Inspect and clean, replace if necessary, as shown on page
5-112.
X
Condenser Clear any
debris from the front of the condenser.
X
Sleeper air
lter Inspect and clean, replace if necessary, as shown on page
5-113.
X
Recirc cab
air lter (ON
HIGHWAY)
Please contact an authorized dealer when the service interval
is required to inspect the cabin recirculation air lter.
X
Recirc cab
air lter
(OFF-HIGHWAY)
Please contact an authorized dealer when the service interval
is required to inspect the cabin recirculation air lter.
X
Aftertreatment
System
System Check for leaks and proper support (shown on page 5-116).
X
Diesel particulate
lter Clean lter. Refer to the Engine Maintenance
Manual.
Diesel exhaust
uid tank Inspect the tank, straps, brackets, hoses and ttings for
abrasion damage, leaks, tightness and fully engaged
connectors.
X
Diesel exhaust
uid supply
module
Replace lter. Refer to the Engine Maintenance
Manual.
5-32 Y53-6047–2C (04/13)

Table of Contents

Related product manuals