Mounting and commissioning the machine
8 - 2
89-005
8.01.02 Connecting the plug-in connections and earth cables
Fig. 8 - 02
● Connect plugs 1- 7 as labelled to the control box.
● Screw the earth cable from the sewing head to earth point A.
● Fasten the earth cable 8 from the motor to earth point B.
● Connect earth point C to earth point A with an earth cable.
● Screw the earth cable from main switch 9 to earth point A.
1
2
5
6
3
C
4
A
B
8
9
7