EasyManua.ls Logo

Pfaff 3117 - First-Time Operation Guide

Pfaff 3117
114 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Mounting and initial operation
9 - 2
9.02 Initial operation
Check the machine for any possible damage, especially the electrical and pneumatic
leads.
Clean the machine thoroughly and then oil it ( see chapter 13 Maintenance and care ).
Connect the machine to the power supply.
Connect the machine to the compressed air supply. The manometer should display an air
pressure level of approx. 6 bar. Adjust to this value if necessary ( see chapter 13.03
Checking the air pressure ).
Carry out a test run.

Table of Contents

Related product manuals