EasyManua.ls Logo

Planer BT37 MarkII - Page 98

Planer BT37 MarkII
175 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
98
BT37 MarkII: Service Manual MA200606 1.0.0
Maintenance and trouble shooting
Fig 1
Fig.2
Open ball valve and turn on Incubator gas supply.
Gas must be supplied at 1.5 bar (22 Psi) (+/- 0.15 bar)
With Incubator now pressurized, close ball valve.
Turn off Incubator gas supply.
Record Gauge pressure in Psi.
Wait 6 minutes. Use a stopwatch to measure the time delay.
Record Gauge pressure in Psi.
Confirm the pressure recorded earlier is not more than 2 psi above the current reading.
(Maximum pressure drop over 6 minutes = 2 psi)
Note both pressure readings on the visit report.

Table of Contents