7.41
Shocks
7
20. Carefully and slowly push the bearing down just past
the retainer groove in the shock body. Install the
retainer ring into the shock body.
21. Once the retainer ring is installed, slowly push the
sho
ck shaft down into the shock body. DO NOT PULL
THE SHAFT OUT. Do not move the shock shaft once
the shaft bottoms out.
NOTE: If the shock shaft rebounds upwards, it has
co
me into contact with the IFP. If this occurs, the IFP
position must be reset.
22. Secure the shock assembly in a bench vise.
23. Use the Top Fill Shock Fill Tool to charge the shock
to
specification. Charge the shock for approximately
10 seconds. During the charging process, the shock
rod must extend outwards.
24. Inspect both ends of the shock assembly for leaks.
25. Slide the bearing assembly cap down the shock shaft.
Use a wr
ench to tighten the bearing assembly cap.
26. Install the body cap and eyelet sleeves and bushings.