www.poolpak.com | 800-959-772584 | ComPak
®
Series - Installation, Operation and Maintenance
DOC# SVW06-STARTUP-20170630
PRE-START INSPECTION
___ 1. Check electrical connections in the ComPak unit for tightness. Include all screw terminals and wiring
lugs on all breakers, motor contactors and field wiring terminals.
___ 2. NOTE: Some terminals on the line side of the Main Power Block may contain factory wiring.
Verify that the incoming power wires were not landed on one of the terminals used from the factory.
Failure to verify may cause damage to wiring or components and will not be covered
under warranty.
___ 3. Verify proper pulley alignment and belt tension on the blower (about 1” of deflection). Check that the
setscrews on the pulleys are tight. (Not present on RoofComPak)
FAN OPERATION
___1. Turn on the main power breaker or disconnect to the unit.
___ 2. On Single-Phase units, skip to step 3. On 3-Phase units, Check the Siemens phase monitor. If the
display shows the correct voltage (U1-U2), skip to step 3. If there is a flashing
symbol on the
display, turn off the main power breaker and switch any two legs of the incoming power at the main
power block. Reapply power and verify that the display shows the correct voltage. If you have any
other problems, please contact the factory.
___ 3. On the ComPak electrical panel, the white 2-pole breaker labeled TR1BR and place the Control Power
Breaker (CPBR) in the ON ( - ) position. The CommandPak CM1 will display “Loading”, the RIU will
beep 5 times and then both will display “CommandPak PCP Control System” and the firmware version
and revision date.
Record the firmware version: Ver:
NOTE: If it displays anything lower than Ver:4.04, contact PoolPak Service immediately for ComPak
Firmware Revision instructions and files.
Throughout this checklist, the first button listed refers to the RIU, the button in ( ) refers to the CM1.
When more than one button is listed in ( ), both buttons must be pressed and released simultaneously.
Use the ENTER (↵) button to enter changes or move the cursor to the next field.
Always remember to return the cursor to the upper left corner of a screen before attempting to
move to the next screen.
___ 4. The supply fan motor will start approximately 10 seconds after power is applied.
NOTE: If the amps are above the FLA value, the duct static pressure may be lower than design.
If above FLA, adjust the motor pulley out to lower the amperage below the FLA value. If you are
unable to get the amps below the rated FLA, contact the factory immediately.
Record the following data: ComPak Nameplate
Supply fan volts 1-2 _____V 1-3 _____V 2-3 _____V _____ V
Supply fan amps 1 _____A 2 _____A 3 _____A _____ FLA
Supply fan speed (RoofComPak only – See Detailed Status screens) _____ RPM