EasyManua.ls Logo

Primus DAM 9 - 16 Metered and Nonmetered Models - Ground Wires from Rear Bulkhead to Accumulator Bracket or Timer (Depending on Model) and from Cabinet Top to Control Panel

Primus DAM 9
128 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
20 516514
Section 4 Grounding
To reduce the risk of electric shock, fire, explosion, serious injury or death:
Disconnect electric power to the dryer(s) before servicing.
Close gas shut-off valve to gas dryer(s) before servicing.
Never start the dryer(s) with any guards/panels removed.
Whenever ground wires are removed during servicing, these ground wires must be
reconnected to ensure that the dryer is properly grounded.
W001R1
WARNING
© Copyright, Alliance Laundry Systems LLC DO NOT COPY or TRANSMIT
16. METERED AND NONMETERED MODELS GROUND WIRES FROM REAR BULKHEAD TO
ACCUMULATOR BRACKET OR TIMER (DEPENDING ON MODEL) AND FROM CABINET TOP
TO CONTROL PANEL
(Figure 4)
Figure 4
D098GE3C
GROUND
WIRES
GROUND
WIRE
GROUND
SCREW
D047KE1A
GROUND
WIRE
TIMER
GROUND
TERMINAL

Table of Contents

Related product manuals