5 Commissioning
WARNING!
Run-in time of sensors
This can result is hazardous incorrect metering
Take into consideration run-in times when commis‐
sioning
–
Correct measuring and metering is only possible if
the sensor is working perfectly
– It is imperative that the run-in times of the sensors
are adhered to
– The run-in times should be allowed for when plan‐
ning initial operation
– It may take a whole working day to run-in the
sensor
– Please read the operating manual for the sensor
5.1 Initial Commissioning
The control module delta
®
has the same language settings as the
control module delta
®
connected to the delta
®
solenoid metering
pump.
5.1.1
Selecting the operating language
Setting the operating language is carried out via the setting menu
of the connected delta
®
solenoid metering pump.
5.1.2 Selection of the Measured Variable and Measuring Range
WARNING!
Incorrect metering due to incorrect metering range
Possible consequence: Fatal or serious injuries
– The measuring range of the sensor is essential for
the measuring range!
–
If the assignment of the measuring range is modi‐
fied, the settings must be checked in all menus
– If the assignment of the measuring range is
changed, the sensor must be recalibrated
Commissioning
21