EasyManuals Logo

Quincy Compressor QSV 205 BOOST User Manual

Quincy Compressor QSV 205 BOOST
122 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #76 background imageLoading...
Page #76 background image
Section IV - Installation
Maximum contact load: 10 A / 250 V AC.
Stop the vacuum pump and switch off the voltage before connecting external
equipment. Consult Quincy.
Pictographs
Figure 6 Pictographs
Reference Designation
1 Switch off the voltage and depressurize the vacuum pump before starting maintenance
or Repairs
2 Lightly oil the gasket of the oil lter, screw it on and tighten by hand (approx. half a
turn)
3 Warning, hot surface
4 Stop the vacuum pump before cleaning the coolers
5 Warning, voltage
6 Switch off the voltage and wait at least 10 minutes before maintenance
7 vacuum pump remains pressurized for 180 seconds after switching off the voltage
8 If the rotation direction is wrong, open the isolating switch in the voltage supply line
and reverse two incoming electric lines
70 Quincy Vacuum Pump-QSV Series

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Quincy Compressor QSV 205 BOOST and is the answer not in the manual?

Quincy Compressor QSV 205 BOOST Specifications

General IconGeneral
BrandQuincy Compressor
ModelQSV 205 BOOST
CategoryWater Pump
LanguageEnglish

Related product manuals