EasyManua.ls Logo

Rapid Shape P20+ User Manual

Default Icon
37 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
3Demax
D20+
P20+
SheraPrint 20
These operating instructions must be read and understood before operating the machine.
Rapid Shape GmbH Roemerstr. 21 71296 Heimsheim Germany
Phone +49 (0)7033 309 878 0 Fax +49 (0)7033 309 878 40 www.rapidshape.de
DOCR000225
English Version of the German Original Operating Instructions

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Rapid Shape P20+ and is the answer not in the manual?

Rapid Shape P20+ Specifications

General IconGeneral
BrandRapid Shape
ModelP20+
Category3D Printers
LanguageEnglish

Summary

1 Safety information

1.1 Symbols

Explains hazard symbols and their meanings, including visual cues for risk levels.

1.2 Safety instructions

Details safety protocols, focusing on electrical hazards and the requirement for qualified personnel.

5 Preparations

6 Getting started

6.3 Connecting up the machine

Steps for connecting power and network cables to the machine.

6.4 Starting the machine

Guide for powering on the machine and initial system startup sequence.

6.6 Printing the first test job

Step-by-step process for executing the initial test print job.

6.7 Netfabb software

6.7.1 Installation

Instructions for installing the netfabb software from the provided USB stick.

6.7.11 Slicing

Process of generating layer-by-layer print data from 3D models.

6.7.12 Transferring printing data via network

Method for sending print data to the machine over a network connection.

6.7.13 Transferring printing data via USB stick

Procedure for transferring print data to the machine using a USB drive.

7 Operation

7.1 Preparing the material reservoir and building platform

Steps for cleaning and preparing the material reservoir and build platform.

7.1.1 Preparing the material reservoir

Detailed process for ensuring the material reservoir is clean and ready.

7.2 Inserting material reservoir / building platform

Steps for correctly inserting the prepared reservoir and platform into the machine.

7.3 Starting a job

Procedures for selecting and initiating a print job on the machine.

7.4 Removing the print job

Instructions for safely removing the finished print from the machine.

7.5 Cleaning the component

Methods for cleaning the printed component after removal from the machine.

7.6 Post-curing

Process for curing printed components using a post-curing unit.

8 Cleaning and maintenance

8.1 Cleaning

General instructions for cleaning the machine after each print.

8.1.1 Cleaning the building platform

Steps for removing residues and cleaning the build platform.

8.1.2 Cleaning the material reservoir

Detailed instructions for cleaning the inside and bottom of the material reservoir.

10 Final decommissioning

10.1 Shutting down the machine

Procedure for safely powering down the machine.

Related product manuals