CHAPTER 3
22 CAN Sidekick Pro Injection for Case IH 3/4XXX Installation and Operation Manual
FIGURE 23. Installed Standoff Bracket
4. Install two 5/8”-11 x 1-1/2”bolts in the extension bracket.
5. Reinstall the inductor on the standoff bracket.
FIGURE 24. Reinstalled Inductor
6. Secure the inductor with two 5/8”-11 flanged lock-nuts. Torque the nuts to 130 lb-ft.
FILL STATION
1. Install the fill station on the left side of the machine, in front of the platform support brackets, using the
supplied fastener plate, 3/8” - 16 x 6” or 8” bolts, 3/8” washers, 3/8” spacers, and 3/8” nyloc washers.
NOTE: Install the bolts so that the spacers and nuts are toward inside of the machine frame to clear
plumbing component installation.
Existing U-Bolt
Hardware
5/8” x 1-1/2” Bolts