EasyManua.ls Logo

Raven Sidekick Pro - Page 24

Raven Sidekick Pro
98 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER 3
22 CAN Sidekick Pro Injection for Case IH 3/4XXX Installation and Operation Manual
FIGURE 23. Installed Standoff Bracket
4. Install two 5/8”-11 x 1-1/2”bolts in the extension bracket.
5. Reinstall the inductor on the standoff bracket.
FIGURE 24. Reinstalled Inductor
6. Secure the inductor with two 5/8”-11 flanged lock-nuts. Torque the nuts to 130 lb-ft.
FILL STATION
1. Install the fill station on the left side of the machine, in front of the platform support brackets, using the
supplied fastener plate, 3/8” - 16 x 6” or 8” bolts, 3/8” washers, 3/8” spacers, and 3/8” nyloc washers.
NOTE: Install the bolts so that the spacers and nuts are toward inside of the machine frame to clear
plumbing component installation.
Existing U-Bolt
Hardware
5/8” x 1-1/2” Bolts

Table of Contents

Other manuals for Raven Sidekick Pro

Related product manuals